Hi,
Is it possible to connect a NW system (NW 701 - Java AS) with ECC system (ECC 6.0 SP08 on NW 7.0) and transport developments from one to another?
As the system that you want to configure is JAVA system you need to activate CTS+ to get the transport moved from DEV(NW 701 - Java AS) ----> QUA(NW 701 - Java AS).
Is ECC system domain controller in your landcape?
To activate Java transport path you need to connect this java system to domain controller and then do the flowing configuration.
Is it possible to transport or will it lead to problems due to version mismatch of NW components (SAP_ABA, SAP_BASIS etc.) ?
In case of i don't see issue as the release is different between the domain controller and the Java system. You are not transporting any thing between release here. You are activating CTS+ which will just help you to create the transport in domain controller and hold the object of your java system.
Till Dev(NW 701 - Java AS). ,QUA(NW 701 - Java AS). and Prod(NW 701 - Java AS). are on the same release i don't see issue .
Thanks
Rishi Abrol