I just installed NW 731. I want to put the leatest SP on it. Now i need to connect to MOPZ. If I do this, i'm connecting to the SLD on my SOLMAN
This will become a PI box. I want it to have its own SLD.
Do I add it for now, and later clean up the SLD on SOLMAN??
Advice?