Quantcast
Channel: SCN: Message List - SAP NetWeaver Administrator
Viewing all articles
Browse latest Browse all 8487

Re: Scheduled Background jobs after Client Copy

$
0
0

Hello All

If I have a client 100 in QA with half a dozen non-SAP standard jobs configured, and I create client 110 in QA and perform a remote client copy from PROD into client 110 on QA, will my non-SAP standard backgrounds run in Client 110, or do I need to set them all up again?

Yes. You will need to set those non standard jobs in the new client. When you schedule a job there will be a reference to the client where the job will be executed is stored under AUTHCKMAN in the table TBTCO. If the job is scheduled periodically then the job is executed only on the client where it is scheduled.

I used SAP_ALL profile when performing the client copy.  So my scheduled jobs WILL have been copied along with everything else? Is that correct?

In SAP_ALL profile the background jobs will be coming from source client not from QA client 100.

No. Background jobs are not transportable and will not be copied during a client copy. Job definitions are client independent.

Read these SAP notes.

31503 - FAQ: Background jobs

51135 - Why are bkgd processing jobs not generally transportable?

 

If you want to schedule those jobs in the new client the follow the suggestion in the SAP note 3150 point 6.

 

Regards

RB


Viewing all articles
Browse latest Browse all 8487

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>